
Cost of Gravel Road Construction in Fort Collins
Constructing a gravel road in Fort Collins, CO, involves various considerations, from material costs to labor expenses. Understanding these factors can help in estimating the overall budget for such a project. This guide provides insights into the key elements that influence the cost of gravel road construction and offers a breakdown of common tasks and their associated costs.
Factors Affecting Cost
- Material Costs: Price of gravel and other materials needed for road construction.
- Labor Costs: Wages for workers involved in the construction process.
- Equipment Rental: Costs for renting machinery like graders and compactors.
- Site Preparation: Expenses related to clearing and preparing the site.
- Permitting Fees: Costs associated with obtaining necessary permits.
- Transportation Costs: Expenses for transporting materials to the construction site.
- Road Length and Width: Larger projects require more materials and labor.
- Drainage Requirements: Additional costs for installing proper drainage systems.
- Soil Condition: Poor soil may need stabilization, increasing costs.
Average Costs for
Task | Cost Range (USD) |
---|---|
Gravel (per ton) | $10 - $50 |
Labor (per hour) | $20 - $50 |
Equipment Rental (per day) | $100 - $500 |
Site Preparation (per acre) | $1,000 - $3,000 |
Permitting Fees | $100 - $500 |
Transportation (per mile) | $2 - $5 |
Road Construction (per linear foot) | $5 - $15 |
Drainage Installation (per linear foot) | $10 - $30 |
Soil Stabilization (per square foot) | $1 - $3 |